Snow and Ice Melting Control Premium
Features
-
Voltage: 120/240 VAC; 50/60 hz, 24A
-
Features NEMA 3R enclosure
-
Supports up to 6 sensors (aerial, gutter, or pavement)
-
Automatic and manual override operator controls
-
2-year warranty
Premium Snow & Ice Melt Control Description
The SCP-120 premium, automatic snow/ice melting control provides for easy installation and operation to minimize energy use. For use with WarmlyYours snow melting or roof and gutter deicing systems, it operates electrically- and mechanically-held contactors for pilot duty applications.
The SCP-120 Premium Snow Melt Control includes an OT-Sensor (for use as an additional slab temperature sensor) and features a NEMA 3R wall-mounted enclosure (recommended for indoor installation). With an Energy Management Computer (EMC) interface and heater hold-on and test capabilities, the unit is rated for 120/240 VAC and supports up to six sensors (aerial, gutter, or pavement). cULus Listed for use in Canada and the U.S.
The maximum load for this control is 24 Amps. We do recommend that it is used in conjunction with a compatible relay panel.
Learn more about snow melting systems. Perfect for heated driveways, patios, walkways and paths, accessibility ramps, or even stairs.
Specifications
Features
Adjust After-Run Time | true |
Air Temp Sensor | true |
Automatic | true |
Moisture Sensor | true |
Outdoor Rated | true |
Slab Temp Sensor | true |
Warranty / Certifications
Approvals | cULus listed |
Area of Use | Non-hazardous locations |
Warranty | 2 years |
Waterproofing | NEMA 3R |
Installation
Best Use | Best For Asphalt Projects |
Electrical
Compatible Sensors and Accessories | RCO, AIR-SS, AIR-SS-2, GTR-SS, SC-SS-PAV-6E-KIT |
Connection Method | Hardwired |
Control Options | Automatic with manual override |
Max Number of Sensors | 6 |
Maximum Current | 24 A |
Mounting Method | Wall Mounted |
Voltage | 120/240 V |
Logistics
Country of Origin (COO) | United States of America |
Product Dimensions
Depth | 6.562 in / 167 mm |
Height | 9.125 in / 232 mm |
Weight | 9.4 lbs |
Width | 11.5 in / 292 mm |
Identifiers
SKU | SCP-120 |
UPC (GTIN-12) | 881308020613 |
Documents & Manuals
Operation Manuals
Technical Information
- Sensor Placement for Snow and Ice Melt Applications (English)
- Snow Melting RCO Specifications (English)
Wiring Diagrams
Sell Sheets
- Premium SCP-120 Snow Melt Control Sell/Specs Sheet (English)
- Snow Melt Controller Comparison Sheet Canada (English)
- Snow Melt Relay Panel (English)
Catalogs
Customer Questions & Answers
Premium Snow & Ice Melt Control has 27 Questions and Answers.
How quickly do these systems melt the snow?
That depends on a number of variables (like the temperature outside) but generally speaking these snow melting systems are designed to melt 1" - 3" of snow per hour. Anything above 3" per hour is typically considered blizzard conditions.Ā
Is it okay to cut the snow melting cable if it is too long for the application for which it was designed?
How does the electric snow melting system compare to hot water tubing (hydronic) systems?
The material costs are similar. However, electric systems are easier to install, with fewer components and significantly lower maintenance costs. Electric systems will run for a shorter period of time to give the same level of performance but with much higher energy efficiency (typically 95%-98% efficient). Controls and sensors required for the two types of systems are very similar. Electric systems do not usually require slab insulation and do not create the concerns typically associated with hydronic systems. These concerns include, but are not limited to, return temperatures, flue gas venting, waterway shrinkage and property damage caused by leaking pipes or tubes.
May I cross or overlap the WarmlyYours snow melt heating cable?
When installing outdoor WarmlyYours snow melting cables for your driveway, patio, walkway, terrace, stairs, ramp, etc. - NEVER cross, overlap, or allow the heating cables to touch each other. Doing so will quickly cause a circuit failure due to excessive heat build up. Always follow the installation instructions and/or design layout plan to ensure the cable is installed with the correct spacing required for proper operation.
Does the factory splice need to be completely embedded during installation?
View all 27 Questions and Answers
Customer Reviews
Premium Snow & Ice Melt Control achieved an average rating of 4.7 stars with 3 reviews by our customers.
Very professional
Llc G., White Plains, NY on 04/19/2024
I needed this product asap.. They were on time and readily available for any questions!
Good product for the price
Mark G., Aston, PA on 01/02/2024
Other than some miscommunication on individual heat cable rolls versus pre-fabricated mats with cables already attached, the installation went pretty well. the control box I ordered was also backordered so needed to go with a more expensive model.
Super simple to use
Anonymous, Elmsdale, NS on 01/07/2021
The controls are super simple to use and I am very happy with the fact it can be remotely controlled using the EMC Interface.