Snow Melt PowerMat 120V, 3 x 15 ft., 45 sq.ft., 18.75A - Refurbished
Features
-
High Heat Output: This embeddable electric heating mat provides nearly 50-watts per sq. ft
-
Embeddable in Concrete, Asphalt, or in Mortar Under Pavers: When you install a mat-based snow melting system within a new driveway, walkway, or patio, you can make sure your outdoor surface will be free of ice and snow all year
-
Even Heating: Snow melting mats come with the heating elements pre-attached to a green mesh in a serpentine pattern with consistent 3” spacing which ensures even heating
-
Fast and Easy Installation: Snow melting mats are faster and easier to install than snow melting cables but a bit more expensive
-
Installation Support: WarmlyYours offers free SmartPlan™ installation plans, 24/7 phone support, and a 10-year limited warranty
Snow Melt Mats Description
Eliminate the risk of falls on snowy or icy surfaces byadding a WarmlyYours snow melting system to your home or business. With45 ft² of radiant heat to efficiently melt snow and ice, the 3 x15 ft. 120 V snow melting mats are composed of a durable,corrosion-resistant, twin-conductor heating element affixed to a polypropylenemesh backing for even distribution of heat in asphalt, concrete or mortar underneathpaver applications.
Safe,CSA certified, for outdoor use in the U.S. and Canada, WarmlyYourssnow melting mats generate 50 watts per square foot for optimal snow meltingperformance.A 20-foot (6m) coldlead is included to adapt to your installation requirements.
Learn more about snow melting systems. Perfect for heated driveways, patios, walkways and paths, accessibility ramps, or even stairs.
Specifications
Electrical
Amps | 18.75 A |
Ohms | 6.4 Ω |
Voltage | 120 V |
Watts | 2250 W |
Watts Per Sq. Ft. | 50 |
Warranty / Certifications
Approvals | cCSAus Listed |
Warranty | 10 years |
Performance
BTU Per Hour | 7677 Btu |
Heated Coverage | 48.75 ft² |
Product Dimensions
Cold Lead Length | 20′ |
Coverage | 45 ft² |
Heating Element Spacing | 3″ |
Heating Element Thickness | 5/16″ |
Height | 0.3125″ |
Length | 15′ |
Size | 3′ x 15′ |
Size and Power | 3x15 ft - 50 W/sq.ft. |
Weight | 10.6 lbs |
Width | 3′ |
Appearance
Color | Green |
Logistics
Country of Origin (COO) | India |
Identifiers
SKU | WHMA-120-0315-BTK |
UPC (GTIN-12) | 881308073060 |
Installation
Surface Types | Asphalt, concrete or in mortar under pavers |
Installation Plans
This is a real example of an installation plan that uses this product. If you want to design your own room or have any questions, please contact us.
Concrete (new) Subfloor
N/A Voltage
240V Operating Cost
420 cents per hour
This Installation Plan Includes:
Documents & Manuals
Installation
- Snow Melting Installation Manual (English)
- Manual de Instalación para Sistemas de Derretimiento de Nieve (Spanish)
- Snow Melting & Slab Heating Application Cross Sections (Spanish)
- Snow Melting & Slab Heating Application Cross Sections (English)
- Snow Melting & Slab Heating Application Cross Sections (French)
- Snow Melting Installation Manual (French)
Project Planners
Warranties
Sell Sheets
Catalogs
Customer Questions & Answers
Snow Melt Mats has 45 Questions and Answers.
How quickly do these systems melt the snow?
That depends on a number of variables (like the temperature outside) but generally speaking these snow melting systems are designed to melt 1" - 3" of snow per hour. Anything above 3" per hour is typically considered blizzard conditions.
23 people found this helpful. Did you find this helpful? Yes NoIs it okay to cut the snow melting cable if it is too long for the application for which it was designed?
May I cross or overlap the WarmlyYours snow melt heating cable?
When installing outdoor WarmlyYours snow melting cables for your driveway, patio, walkway, terrace, stairs, ramp, etc. - NEVER cross, overlap, or allow the heating cables to touch each other. Doing so will quickly cause a circuit failure due to excessive heat build up. Always follow the installation instructions and/or design layout plan to ensure the cable is installed with the correct spacing required for proper operation.
14 people found this helpful. Did you find this helpful? Yes NoHow does the electric snow melting system compare to hot water tubing (hydronic) systems?
The material costs are similar. However, electric systems are easier to install, with fewer components and significantly lower maintenance costs. Electric systems will run for a shorter period of time to give the same level of performance but with much higher energy efficiency (typically 95%-98% efficient). Controls and sensors required for the two types of systems are very similar. Electric systems do not usually require slab insulation and do not create the concerns typically associated with hydronic systems. These concerns include, but are not limited to, return temperatures, flue gas venting, waterway shrinkage and property damage caused by leaking pipes or tubes.
14 people found this helpful. Did you find this helpful? Yes NoDoes the factory splice need to be completely embedded during installation?
View all 45 Questions and Answers