Snow and Ice Melting Timer Control
Features
-
Reliable manual control
-
Timer adjustable up to 12 hours
-
Useable with snow melting or roof and gutter deicing systems
-
Extremely easy operation
-
Terminal block and removable knockouts for easy installation
Timer Control Snow & Ice Melt Description
The WarmlyYours SCM-DUAL Snow and Ice Melting Timer Control is a simple, affordable option for snow melting, slab heating, and roof and gutter deicing systems. At120V operational voltage, this unit features a 12-hour, adjustable timer and a NEMA 1 enclosure with hinged cover.Ā
The operation of this control couldn't be easier as the user can simply turn the timer to their desired heating duration.Ā It includes a 2-pole relay and terminal block for easy wiring. This control comes with integrated removable knockouts (4 on each side) so that you can run conduits through them without having to cut the metal box.Ā
For projectsĀ with a smaller amperage draw (20 Amps for 120V or 10 Amps for 240 - 277V), theĀ SCM-DUAL can be used without a relay panel. However, for projects with larger amperage draws, the controller must be used with a compatible relay panel. Using a relay panel, sold separately, allows control of larger jobs and can help switch voltages ranging from 120V to 277V.
Learn more about snow melting systems. Perfect for heated driveways, patios, walkways and paths, accessibility ramps, or even stairs.
Specifications
Electrical
Applicable Voltages | 120 V, 240 V, 277 V |
Connection Method | Hardwired |
Ingress Protection (IPxx) Rating | IP20 |
Knockouts Available | Yes |
Maximum Current Description | 20 Amp, 120 VAC, 50/60 Hz; 10 Amp, 240 VAC, 50/60 Hz; 10 Amp, 277 VAC, 50/60 Hz |
Maximum Load (Resistive Only) | 20 Amp, 120 VAC, 50/60 Hz; 10 Amp, 240 VAC, 50/60 Hz; 10 Amp, 277 VAC, 50/60 Hz |
Warranty / Certifications
Approvals | cULus listed |
Compliances | UL-50 Type 1, CSA Type 1, NEMA Type 1, IEC 60529, IP20 |
Warranty | 2 years |
Installation
Best Use | Typically Used For Projects That Require On-demand Operation |
Product Dimensions
Depth | 4ā³ |
Height | 6ā³ |
Weight | 6 lbs |
Width | 6ā³ |
Appearance
Finish | ANSI 61 gray powder coating |
Identifiers
SKU | SCM-DUAL |
UPC (GTIN-12) | 881308064440 |
Documents & Manuals
Installation
Technical Information
Wiring Diagrams
- SCM-DUAL Snow and Ice Melting Timer Control to Heating Element Wiring Diagram (English)
- SCM-DUAL Snow and Ice Melting Timer Control to Relay Panel Wiring Diagram (English)
Sell Sheets
- Snow Melt Controller Comparison Sheet USA (English)
- Snow and Ice Melting Timer Control Sell Sheet (English)
Catalogs
Customer Questions & Answers
Timer Control Snow & Ice Melt has 26 Questions and Answers.
How quickly do these systems melt the snow?
That depends on a number of variables (like the temperature outside) but generally speaking these snow melting systems are designed to melt 1" - 3" of snow per hour. Anything above 3" per hour is typically considered blizzard conditions.Ā
Is it okay to cut the snow melting cable if it is too long for the application for which it was designed?
How does the electric snow melting system compare to hot water tubing (hydronic) systems?
The material costs are similar. However, electric systems are easier to install, with fewer components and significantly lower maintenance costs. Electric systems will run for a shorter period of time to give the same level of performance but with much higher energy efficiency (typically 95%-98% efficient). Controls and sensors required for the two types of systems are very similar. Electric systems do not usually require slab insulation and do not create the concerns typically associated with hydronic systems. These concerns include, but are not limited to, return temperatures, flue gas venting, waterway shrinkage and property damage caused by leaking pipes or tubes.
May I cross or overlap the WarmlyYours snow melt heating cable?
When installing outdoor WarmlyYours snow melting cables for your driveway, patio, walkway, terrace, stairs, ramp, etc. - NEVER cross, overlap, or allow the heating cables to touch each other. Doing so will quickly cause a circuit failure due to excessive heat build up. Always follow the installation instructions and/or design layout plan to ensure the cable is installed with the correct spacing required for proper operation.
Does the factory splice need to be completely embedded during installation?
View all 26 Questions and Answers
Customer Reviews
Timer Control Snow & Ice Melt achieved an average rating of 5.0 stars with 1 reviews by our customers.
Excellent support, product, documentation, and stock
Mitchell S., Richmond Hill, ON on 11/15/2023
I had many questions, both while planning, and just before installation. WarmlyYours was great and answers, their on-line documentation is detailed and helpful, and everything was in-stock for pick-up. Looking forward to the snow.